O-I Manufacturing Netherlands B.V., vestiging Leerdam

O-I Manufacturing Netherlands B.V., vestiging Leerdam is a manufacture of glass installation in Netherlands. In 2025 it reported 104,525 tonnes of verified emissions against 88,605 free allowances.

Key figures

Country

Netherlands

Activity

Manufacture of glass

Installation ID

NL 131

Verified emissions, 2025

104,525 tCO₂e

Free allocation, 2025

88,605 allowances

Allowance position, 2025

15,920 short

Compliance, 2024

A

Permit

NL-200400230

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of O-I Manufacturing Netherlands B.V., vestiging LeerdamVerified emissions and free allocation from 2013 to 2025.050k100k150k200k2013 verified emissions: 107,068 t2014 verified emissions: 113,733 t2015 verified emissions: 117,830 t2016 verified emissions: 112,948 t2017 verified emissions: 101,739 t2018 verified emissions: 105,311 t2019 verified emissions: 106,992 t2020 verified emissions: 87,949 t2021 verified emissions: 103,091 t2022 verified emissions: 100,588 t2023 verified emissions: 98,712 t2024 verified emissions: 96,214 t2025 verified emissions: 104,525 t2013 free allocation: 117,137 t2014 free allocation: 115,102 t2015 free allocation: 113,044 t2016 free allocation: 110,964 t2017 free allocation: 108,862 t2018 free allocation: 106,739 t2019 free allocation: 104,589 t2020 free allocation: 102,433 t2021 free allocation: 87,840 t2022 free allocation: 87,579 t2023 free allocation: 88,605 t2024 free allocation: 88,605 t2025 free allocation: 88,605 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 104,525 88,605 15,920 short
2024 96,214 88,605 7,609 short
2023 98,712 88,605 10,107 short
2022 100,588 87,579 13,009 short
2021 103,091 87,840 15,251 short
2020 87,949 102,433 14,484 surplus
2019 106,992 104,589 2,403 short
2018 105,311 106,739 1,428 surplus
2017 101,739 108,862 7,123 surplus
2016 112,948 110,964 1,984 short
2015 117,830 113,044 4,786 short
2014 113,733 115,102 1,369 surplus
2013 107,068 117,137 10,069 surplus

Verified emissions changed by -2.4% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 15,920 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €85.90 (28 September 2026): €1,367,528. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Manufacture of glass installations in Netherlands, largest first.

Questions about O-I Manufacturing Netherlands B.V., vestiging Leerdam

How much did O-I Manufacturing Netherlands B.V., vestiging Leerdam emit in 2025?

104,525 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did O-I Manufacturing Netherlands B.V., vestiging Leerdam receive?

88,605 in 2025.

Did O-I Manufacturing Netherlands B.V., vestiging Leerdam surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.