AS Rockwool Avd. Trondheim
AS Rockwool Avd. Trondheim is a manufacture of mineral wool installation in Norway. In 2025 it reported 6,542 tonnes of verified emissions against 13,872 free allowances.
Key figures
Country
Activity
Installation ID
NO 203944
Verified emissions, 2025
6,542 tCO₂e
Free allocation, 2025
13,872 allowances
Allowance position, 2025
7,330 surplus
Compliance, 2024
A
Permit
NO-2011-1360
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 6,542 | 13,872 | 7,330 surplus |
| 2024 | 18,186 | 13,872 | 4,314 short |
| 2023 | 17,774 | 13,872 | 3,902 short |
| 2022 | 24,248 | 13,496 | 10,752 short |
| 2021 | 23,167 | 12,385 | 10,782 short |
| 2020 | 23,418 | 12,004 | 11,414 short |
| 2019 | 18,557 | 12,257 | 6,300 short |
| 2018 | 20,050 | 12,508 | 7,542 short |
| 2017 | 17,800 | 12,757 | 5,043 short |
| 2016 | 16,154 | 13,004 | 3,150 short |
| 2015 | 15,927 | 13,247 | 2,680 short |
| 2014 | 15,224 | 13,489 | 1,735 short |
| 2013 | 17,223 | 13,727 | 3,496 short |
Verified emissions changed by -62% from 2013 to 2025.
Source: European Commission, Union Registry ยท Data as of 1 April 2026
Allowance position
Free allocation exceeded verified emissions in 2025, by 7,330 allowances.
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Manufacture of mineral wool installations in Norway, largest first.
- AS Rockwool Avd Moss 10,609 t in 2025
Questions about AS Rockwool Avd. Trondheim
How much did AS Rockwool Avd. Trondheim emit in 2025?
6,542 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did AS Rockwool Avd. Trondheim receive?
13,872 in 2025.
Did AS Rockwool Avd. Trondheim surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.