Instalacja do produkcji papieru lub tektury
Instalacja do produkcji papieru lub tektury is a production of paper or cardboard installation in Poland. In 2025 it reported 4,669 tonnes of verified emissions against 4,427 free allowances.
Key figures
Country
Activity
Installation ID
PL 439
Verified emissions, 2025
4,669 tCO₂e
Free allocation, 2025
4,427 allowances
Allowance position, 2025
242 short
Compliance, 2024
A
Permit
PL-0859-05
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 4,669 | 4,427 | 242 short |
| 2024 | 4,647 | 4,884 | 237 surplus |
| 2023 | 4,761 | 4,427 | 334 short |
| 2022 | 4,773 | 4,309 | 464 short |
| 2021 | 4,668 | 4,309 | 359 short |
| 2020 | 4,742 | 4,767 | 25 surplus |
| 2019 | 4,773 | 4,867 | 94 surplus |
| 2018 | 4,934 | 4,967 | 33 surplus |
| 2017 | 5,145 | 5,066 | 79 short |
| 2016 | 4,652 | 5,164 | 512 surplus |
| 2015 | 4,889 | 5,260 | 371 surplus |
| 2014 | 4,600 | 5,356 | 756 surplus |
| 2013 | 4,839 | 5,451 | 612 surplus |
Verified emissions changed by -3.5% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 242 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €20,539. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of paper or cardboard installations in Poland, largest first.
- Fabryka Papieru Kaczory Zakład nr 2 5,332 t in 2025
- FABRYKA PAPIERU KACZORY ZAKŁAD NR 1 2,283 t in 2025
- INSTALACJA PRODUKCJI PAPIERU 0 t in 2025
- Malta-Decor Sp. z o.o. 0 t in 2025
Questions about Instalacja do produkcji papieru lub tektury
How much did Instalacja do produkcji papieru lub tektury emit in 2025?
4,669 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Instalacja do produkcji papieru lub tektury receive?
4,427 in 2025.
Did Instalacja do produkcji papieru lub tektury surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.