Instalacja do produkcji wapna PIEC MAERZ

Instalacja do produkcji wapna PIEC MAERZ is a production of lime, or calcination of dolomite/magnesite installation in Poland. It last reported verified emissions for 2024: 174,588 tonnes.

Key figures

Country

Poland

Activity

Production of lime, or calcination of dolomite/magnesite

Installation ID

PL 201356

Verified emissions, 2024

174,588 tCO₂e

Free allocation, 2024

137,608 allowances

Allowance position, 2024

Not available

Compliance, 2024

A

Permit

PL-1063-08

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Instalacja do produkcji wapna PIEC MAERZVerified emissions and free allocation from 2013 to 2025.0125k250k375k500k2013 verified emissions: 200,224 t2014 verified emissions: 211,170 t2015 verified emissions: 217,587 t2016 verified emissions: 198,805 t2017 verified emissions: 222,087 t2018 verified emissions: 222,707 t2019 verified emissions: 189,231 t2020 verified emissions: 176,317 t2021 verified emissions: 182,574 t2022 verified emissions: 181,349 t2023 verified emissions: 195,193 t2024 verified emissions: 174,588 t2020 free allocation: 140,584 t2021 free allocation: 137,608 t2022 free allocation: 137,608 t2023 free allocation: 137,608 t2024 free allocation: 137,608 t2025 free allocation: 137,608 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 none 137,608
2024 174,588 137,608 36,980 short
2023 195,193 137,608 57,585 short
2022 181,349 137,608 43,741 short
2021 182,574 137,608 44,966 short
2020 176,317 140,584 35,733 short
2019 189,231 none 189,231 short
2018 222,707 none 222,707 short
2017 222,087 none 222,087 short
2016 198,805 none 198,805 short
2015 217,587 none 217,587 short
2014 211,170 none 211,170 short
2013 200,224 none 200,224 short

Verified emissions changed by -12.8% from 2013 to 2024.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

No verified emissions were reported for 2025, so there is no position for the latest year.

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production of lime, or calcination of dolomite/magnesite installations in Poland, largest first.

Questions about Instalacja do produkcji wapna PIEC MAERZ

How much did Instalacja do produkcji wapna PIEC MAERZ emit in 2024?

174,588 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Instalacja do produkcji wapna PIEC MAERZ receive?

137,608 in 2024.

Did Instalacja do produkcji wapna PIEC MAERZ surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.