Piec obrotowy do wypalania klinkieru dolomitowego

Piec obrotowy do wypalania klinkieru dolomitowego is a production of lime, or calcination of dolomite/magnesite installation in Poland. It last reported verified emissions for 2024: 0 tonnes.

Key figures

Country

Poland

Activity

Production of lime, or calcination of dolomite/magnesite

Installation ID

PL 847

Verified emissions, 2024

0 tCO₂e

Free allocation, 2024

0 allowances

Allowance position, 2024

Not available

Compliance, 2024

A

Permit

PL-0775-05

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Piec obrotowy do wypalania klinkieru dolomitowegoVerified emissions and free allocation from 2013 to 2025.012.5k25k37.5k50k2013 verified emissions: 26,850 t2014 verified emissions: 20,927 t2015 verified emissions: 22,197 t2016 verified emissions: 21,998 t2017 verified emissions: 34,674 t2018 verified emissions: 11,934 t2019 verified emissions: 0 t2020 verified emissions: 0 t2021 verified emissions: 0 t2022 verified emissions: 0 t2023 verified emissions: 0 t2024 verified emissions: 0 t2013 free allocation: 34,773 t2014 free allocation: 34,169 t2015 free allocation: 33,558 t2016 free allocation: 32,941 t2017 free allocation: 32,317 t2018 free allocation: 31,686 t2019 free allocation: 15,524 t2020 free allocation: 0 t2021 free allocation: 0 t2022 free allocation: 0 t2023 free allocation: 0 t2024 free allocation: 0 t2025 free allocation: 0 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 none 0
2024 0 0 balanced
2023 0 0 balanced
2022 0 0 balanced
2021 0 0 balanced
2020 0 0 balanced
2019 0 15,524 15,524 surplus
2018 11,934 31,686 19,752 surplus
2017 34,674 32,317 2,357 short
2016 21,998 32,941 10,943 surplus
2015 22,197 33,558 11,361 surplus
2014 20,927 34,169 13,242 surplus
2013 26,850 34,773 7,923 surplus

Verified emissions changed by -100% from 2013 to 2024.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

No verified emissions were reported for 2025, so there is no position for the latest year.

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production of lime, or calcination of dolomite/magnesite installations in Poland, largest first.

Questions about Piec obrotowy do wypalania klinkieru dolomitowego

How much did Piec obrotowy do wypalania klinkieru dolomitowego emit in 2024?

0 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Piec obrotowy do wypalania klinkieru dolomitowego receive?

0 in 2024.

Did Piec obrotowy do wypalania klinkieru dolomitowego surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.