Insdustria Mineral - Prod Cales não Hidraulicas
Insdustria Mineral - Prod Cales não Hidraulicas is a production of cement clinker installation in Portugal. In 2025 it reported 300,928 tonnes of verified emissions against 279,872 free allowances.
Key figures
Country
Activity
Installation ID
PT 38
Verified emissions, 2025
300,928 tCO₂e
Free allocation, 2025
279,872 allowances
Allowance position, 2025
21,056 short
Compliance, 2024
A
Permit
79
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 300,928 | 279,872 | 21,056 short |
| 2024 | 301,386 | 276,683 | 24,703 short |
| 2023 | 310,681 | 282,324 | 28,357 short |
| 2022 | 315,839 | 286,900 | 28,939 short |
| 2021 | 339,766 | 286,900 | 52,866 short |
| 2020 | 342,057 | 260,556 | 81,501 short |
| 2019 | 368,006 | 266,042 | 101,964 short |
| 2018 | 384,566 | 271,509 | 113,057 short |
| 2017 | 370,048 | 276,908 | 93,140 short |
| 2016 | 353,280 | 282,257 | 71,023 short |
| 2015 | 375,873 | 287,547 | 88,326 short |
| 2014 | 353,529 | 292,783 | 60,746 short |
| 2013 | 322,084 | 297,958 | 24,126 short |
Verified emissions changed by -6.6% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 21,056 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €1,787,023. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
CBAM context
This activity falls in the cement sector of the Carbon Border Adjustment Mechanism. Free allocation for products covered by the Carbon Border Adjustment Mechanism is being reduced each year under current EU law.
| 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 |
|---|---|---|---|---|---|---|---|---|
| 97.5% | 95% | 90% | 77.5% | 51.5% | 39% | 26.5% | 14% | 0% |
Share of free allocation remaining for CBAM-covered products, under Directive (EU) 2023/959, Article 10a. It applies to the benchmarks for those products, not necessarily to an installation's whole allocation, so it is not applied to the figures on this page.
Proposed change
A European Commission proposal of 17 July 2026 would restore 15% of the phased-out free allocation for CBAM sectors from 2028 and extend the end of the phase-out from 2034 to 2038. This is a proposal and not yet law.
More on CBAM: the India CBAM Center and what CBAM is and how it works.
Nearby installations
Production of cement clinker installations in Portugal, largest first.
- Centro de Produção de Souselas 851,920 t in 2025
- Cimpor - Centro de Produção de Alhandra 838,261 t in 2025
- Fábrica SECIL - Outão 664,791 t in 2025
- Fábrica Maceira-Liz 416,680 t in 2025
- Centro de Produção de Loulé 230,770 t in 2025
Questions about Insdustria Mineral - Prod Cales não Hidraulicas
How much did Insdustria Mineral - Prod Cales não Hidraulicas emit in 2025?
300,928 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Insdustria Mineral - Prod Cales não Hidraulicas receive?
279,872 in 2025.
Did Insdustria Mineral - Prod Cales não Hidraulicas surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.