Ria Stone, Fábrica de Louça de Mesa em Grés, SA

Ria Stone, Fábrica de Louça de Mesa em Grés, SA is a manufacture of ceramics installation in Portugal. In 2025 it reported 10,487 tonnes of verified emissions against 9,400 free allowances.

Key figures

Country

Portugal

Activity

Manufacture of ceramics

Installation ID

PT 210678

Verified emissions, 2025

10,487 tCO₂e

Free allocation, 2025

9,400 allowances

Allowance position, 2025

1,087 short

Compliance, 2024

A

Permit

TEGEE317

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Ria Stone, Fábrica de Louça de Mesa em Grés, SAVerified emissions and free allocation from 2018 to 2025.05k10k15k20k2018 verified emissions: 314 t2019 verified emissions: 12,640 t2020 verified emissions: 11,927 t2021 verified emissions: 12,969 t2022 verified emissions: 12,865 t2023 verified emissions: 12,984 t2024 verified emissions: 11,494 t2025 verified emissions: 10,487 t2019 free allocation: 12,014 t2020 free allocation: 11,581 t2021 free allocation: 9,484 t2022 free allocation: 9,383 t2023 free allocation: 10,004 t2024 free allocation: 10,004 t2025 free allocation: 9,400 t20182019202020212022202320242025
YearVerified emissions (t) Free allocationPosition
2025 10,487 9,400 1,087 short
2024 11,494 10,004 1,490 short
2023 12,984 10,004 2,980 short
2022 12,865 9,383 3,482 short
2021 12,969 9,484 3,485 short
2020 11,927 11,581 346 short
2019 12,640 12,014 626 short
2018 314 none 314 short

Verified emissions changed by +3,239.8% from 2018 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 1,087 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €85.90 (28 September 2026): €93,373. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Manufacture of ceramics installations in Portugal, largest first.

Questions about Ria Stone, Fábrica de Louça de Mesa em Grés, SA

How much did Ria Stone, Fábrica de Louça de Mesa em Grés, SA emit in 2025?

10,487 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Ria Stone, Fábrica de Louça de Mesa em Grés, SA receive?

9,400 in 2025.

Did Ria Stone, Fábrica de Louça de Mesa em Grés, SA surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.