Metal Ravne d.o.o.
Metal Ravne d.o.o. is a production of pig iron or steel installation in Slovenia. In 2025 it reported 66,977 tonnes of verified emissions against 61,117 free allowances.
Key figures
Country
Activity
Installation ID
SI 8
Verified emissions, 2025
66,977 tCO₂e
Free allocation, 2025
61,117 allowances
Allowance position, 2025
5,860 short
Compliance, 2024
A
Permit
SI-35433-82-2004
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 66,977 | 61,117 | 5,860 short |
| 2024 | 70,803 | 63,306 | 7,497 short |
| 2023 | 69,739 | 63,488 | 6,251 short |
| 2022 | 76,683 | 63,488 | 13,195 short |
| 2021 | 81,450 | 63,306 | 18,144 short |
| 2020 | 77,029 | 49,000 | 28,029 short |
| 2019 | 80,104 | 50,032 | 30,072 short |
| 2018 | 82,461 | 51,061 | 31,400 short |
| 2017 | 83,859 | 52,076 | 31,783 short |
| 2016 | 85,558 | 53,082 | 32,476 short |
| 2015 | 76,202 | 54,076 | 22,126 short |
| 2014 | 71,218 | 55,061 | 16,157 short |
| 2013 | 67,897 | 56,035 | 11,862 short |
Verified emissions changed by -1.4% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 5,860 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €497,338. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
CBAM context
This activity falls in the iron and steel sector of the Carbon Border Adjustment Mechanism. Free allocation for products covered by the Carbon Border Adjustment Mechanism is being reduced each year under current EU law.
| 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 |
|---|---|---|---|---|---|---|---|---|
| 97.5% | 95% | 90% | 77.5% | 51.5% | 39% | 26.5% | 14% | 0% |
Share of free allocation remaining for CBAM-covered products, under Directive (EU) 2023/959, Article 10a. It applies to the benchmarks for those products, not necessarily to an installation's whole allocation, so it is not applied to the figures on this page.
Proposed change
A European Commission proposal of 17 July 2026 would restore 15% of the phased-out free allocation for CBAM sectors from 2028 and extend the end of the phase-out from 2034 to 2038. This is a proposal and not yet law.
More on CBAM: the India CBAM Center and what CBAM is and how it works.
Nearby installations
Production of pig iron or steel installations in Slovenia, largest first.
- Acroni, d.o.o. 86,003 t in 2025
- ŠTORE STEEL D.O.O. 31,156 t in 2025
Questions about Metal Ravne d.o.o.
How much did Metal Ravne d.o.o. emit in 2025?
66,977 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Metal Ravne d.o.o. receive?
61,117 in 2025.
Did Metal Ravne d.o.o. surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.