F. de Placas Pladur Gelsa

F. de Placas Pladur Gelsa is a production or processing of gypsum or plasterboard installation in Spain. In 2025 it reported 14,599 tonnes of verified emissions against 4,672 free allowances.

Key figures

Country

Spain

Activity

Production or processing of gypsum or plasterboard

Installation ID

ES 210703

Verified emissions, 2025

14,599 tCO₂e

Free allocation, 2025

4,672 allowances

Allowance position, 2025

9,927 short

Compliance, 2024

A

Permit

ES02501519-3350

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of F. de Placas Pladur GelsaVerified emissions and free allocation from 2018 to 2025.012.5k25k37.5k50k2018 verified emissions: 1,471 t2019 verified emissions: 17,725 t2020 verified emissions: 16,584 t2021 verified emissions: 20,943 t2022 verified emissions: 23,591 t2023 verified emissions: 22,651 t2024 verified emissions: 16,567 t2025 verified emissions: 14,599 t2018 free allocation: 0 t2019 free allocation: 17,883 t2020 free allocation: 20,233 t2021 free allocation: 3,994 t2022 free allocation: 3,994 t2023 free allocation: 5,065 t2024 free allocation: 5,338 t2025 free allocation: 4,672 t20182019202020212022202320242025
YearVerified emissions (t) Free allocationPosition
2025 14,599 4,672 9,927 short
2024 16,567 5,338 11,229 short
2023 22,651 5,065 17,586 short
2022 23,591 3,994 19,597 short
2021 20,943 3,994 16,949 short
2020 16,584 20,233 3,649 surplus
2019 17,725 17,883 158 surplus
2018 1,471 0 1,471 short

Verified emissions changed by +892.5% from 2018 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 9,927 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €84.87 (29 September 2026): €842,504. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production or processing of gypsum or plasterboard installations in Spain, largest first.

Questions about F. de Placas Pladur Gelsa

How much did F. de Placas Pladur Gelsa emit in 2025?

14,599 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did F. de Placas Pladur Gelsa receive?

4,672 in 2025.

Did F. de Placas Pladur Gelsa surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.