F. de Zinc Electrolítico S. Juan de Nieva

F. de Zinc Electrolítico S. Juan de Nieva is a production or processing of non-ferrous metals installation in Spain. In 2025 it reported 12,431 tonnes of verified emissions against 83,358 free allowances.

Key figures

Country

Spain

Activity

Production or processing of non-ferrous metals

Installation ID

ES 882

Verified emissions, 2025

12,431 tCO₂e

Free allocation, 2025

83,358 allowances

Allowance position, 2025

70,927 surplus

Compliance, 2024

A

Permit

ES033301001035

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of F. de Zinc Electrolítico S. Juan de NievaVerified emissions and free allocation from 2013 to 2025.025k50k75k100k2013 verified emissions: 13,254 t2014 verified emissions: 10,107 t2015 verified emissions: 10,182 t2016 verified emissions: 8,239 t2017 verified emissions: 6,211 t2018 verified emissions: 8,675 t2019 verified emissions: 5,609 t2020 verified emissions: 5,919 t2021 verified emissions: 10,580 t2022 verified emissions: 10,320 t2023 verified emissions: 9,294 t2024 verified emissions: 14,975 t2025 verified emissions: 12,431 t2013 free allocation: 9,619 t2014 free allocation: 9,452 t2015 free allocation: 9,283 t2016 free allocation: 9,112 t2017 free allocation: 8,939 t2018 free allocation: 8,764 t2019 free allocation: 8,588 t2020 free allocation: 8,412 t2021 free allocation: 70,106 t2022 free allocation: 70,808 t2023 free allocation: 70,106 t2024 free allocation: 70,106 t2025 free allocation: 83,358 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 12,431 83,358 70,927 surplus
2024 14,975 70,106 55,131 surplus
2023 9,294 70,106 60,812 surplus
2022 10,320 70,808 60,488 surplus
2021 10,580 70,106 59,526 surplus
2020 5,919 8,412 2,493 surplus
2019 5,609 8,588 2,979 surplus
2018 8,675 8,764 89 surplus
2017 6,211 8,939 2,728 surplus
2016 8,239 9,112 873 surplus
2015 10,182 9,283 899 short
2014 10,107 9,452 655 short
2013 13,254 9,619 3,635 short

Verified emissions changed by -6.2% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

Free allocation exceeded verified emissions in 2025, by 70,927 allowances.

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production or processing of non-ferrous metals installations in Spain, largest first.

Questions about F. de Zinc Electrolítico S. Juan de Nieva

How much did F. de Zinc Electrolítico S. Juan de Nieva emit in 2025?

12,431 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did F. de Zinc Electrolítico S. Juan de Nieva receive?

83,358 in 2025.

Did F. de Zinc Electrolítico S. Juan de Nieva surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.