Verallia Spain, S.A.- Alcalá de Guadaira
Verallia Spain, S.A.- Alcalá de Guadaira is a manufacture of glass installation in Spain. In 2025 it reported 55,432 tonnes of verified emissions against 33,544 free allowances.
Key figures
Country
Activity
Installation ID
ES 154
Verified emissions, 2025
55,432 tCO₂e
Free allocation, 2025
33,544 allowances
Allowance position, 2025
21,888 short
Compliance, 2024
A
Permit
ES014107000165
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 55,432 | 33,544 | 21,888 short |
| 2024 | 43,922 | 37,501 | 6,421 short |
| 2023 | 61,511 | 35,809 | 25,702 short |
| 2022 | 63,823 | 33,117 | 30,706 short |
| 2021 | 59,179 | 33,543 | 25,636 short |
| 2020 | 58,034 | 36,504 | 21,530 short |
| 2019 | 60,252 | 37,273 | 22,979 short |
| 2018 | 60,749 | 38,039 | 22,710 short |
| 2017 | 60,039 | 38,794 | 21,245 short |
| 2016 | 61,975 | 39,544 | 22,431 short |
| 2015 | 43,990 | 40,285 | 3,705 short |
| 2014 | 40,055 | 41,019 | 964 surplus |
| 2013 | 44,063 | 41,743 | 2,320 short |
Verified emissions changed by +25.8% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 21,888 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €1,857,635. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Manufacture of glass installations in Spain, largest first.
- Guardian Industries Navarra, S.L. 114,079 t in 2025
- AGC Flat Glass Ibérica, S.A. 110,824 t in 2025
- Crisnova Vidrio, S.A. 104,978 t in 2025
- B.A. Glass Spain, S.A. - Villafranca de los Barros 98,624 t in 2025
- Saint-Gobain Cristalería S.L 97,477 t in 2025
Questions about Verallia Spain, S.A.- Alcalá de Guadaira
How much did Verallia Spain, S.A.- Alcalá de Guadaira emit in 2025?
55,432 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Verallia Spain, S.A.- Alcalá de Guadaira receive?
33,544 in 2025.
Did Verallia Spain, S.A.- Alcalá de Guadaira surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.