Air Liquide Large Industry VTE Jupiter 1

Air Liquide Large Industry VTE Jupiter 1 is a production of hydrogen and synthesis gas installation in Belgium. In 2025 it reported 360,407 tonnes of verified emissions against 270,202 free allowances.

Key figures

Country

Belgium

Activity

Production of hydrogen and synthesis gas

Installation ID

BE 205741

Verified emissions, 2025

360,407 tCO₂e

Free allocation, 2025

270,202 allowances

Allowance position, 2025

90,205 short

Compliance, 2024

A

Permit

VL152A

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Air Liquide Large Industry VTE Jupiter 1Verified emissions and free allocation from 2013 to 2025.0250k500k750k1M2013 verified emissions: 313,903 t2014 verified emissions: 354,371 t2015 verified emissions: 361,511 t2016 verified emissions: 282,410 t2017 verified emissions: 311,833 t2018 verified emissions: 346,724 t2019 verified emissions: 504,790 t2020 verified emissions: 472,731 t2021 verified emissions: 297,385 t2022 verified emissions: 399,888 t2023 verified emissions: 396,310 t2024 verified emissions: 353,214 t2025 verified emissions: 360,407 t2013 free allocation: 380,585 t2014 free allocation: 373,975 t2015 free allocation: 367,287 t2016 free allocation: 360,529 t2017 free allocation: 353,698 t2018 free allocation: 346,801 t2019 free allocation: 339,818 t2020 free allocation: 332,810 t2021 free allocation: 329,645 t2022 free allocation: 260,940 t2023 free allocation: 220,425 t2024 free allocation: 290,649 t2025 free allocation: 270,202 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 360,407 270,202 90,205 short
2024 353,214 290,649 62,565 short
2023 396,310 220,425 175,885 short
2022 399,888 260,940 138,948 short
2021 297,385 329,645 32,260 surplus
2020 472,731 332,810 139,921 short
2019 504,790 339,818 164,972 short
2018 346,724 346,801 77 surplus
2017 311,833 353,698 41,865 surplus
2016 282,410 360,529 78,119 surplus
2015 361,511 367,287 5,776 surplus
2014 354,371 373,975 19,604 surplus
2013 313,903 380,585 66,682 surplus

Verified emissions changed by +14.8% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 90,205 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €85.50 (25 September 2026): €7,712,528. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

CBAM context

This activity falls in the hydrogen sector of the Carbon Border Adjustment Mechanism. Free allocation for products covered by the Carbon Border Adjustment Mechanism is being reduced each year under current EU law.

Free allocation remaining for CBAM-covered products, by year
202620272028202920302031203220332034
97.5%95%90%77.5%51.5%39%26.5%14%0%

Share of free allocation remaining for CBAM-covered products, under Directive (EU) 2023/959, Article 10a. It applies to the benchmarks for those products, not necessarily to an installation's whole allocation, so it is not applied to the figures on this page.

Proposed change

A European Commission proposal of 17 July 2026 would restore 15% of the phased-out free allocation for CBAM sectors from 2028 and extend the end of the phase-out from 2034 to 2038. This is a proposal and not yet law.

More on CBAM: the India CBAM Center and what CBAM is and how it works.

Nearby installations

Production of hydrogen and synthesis gas installations in Belgium, largest first.

Questions about Air Liquide Large Industry VTE Jupiter 1

How much did Air Liquide Large Industry VTE Jupiter 1 emit in 2025?

360,407 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Air Liquide Large Industry VTE Jupiter 1 receive?

270,202 in 2025.

Did Air Liquide Large Industry VTE Jupiter 1 surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.