Air Liquide Large Industry VTE Jupiter 2

Air Liquide Large Industry VTE Jupiter 2 is a production of hydrogen and synthesis gas installation in Belgium. In 2025 it reported 357,427 tonnes of verified emissions against 231,063 free allowances.

Key figures

Country

Belgium

Activity

Production of hydrogen and synthesis gas

Installation ID

BE 205743

Verified emissions, 2025

357,427 tCO₂e

Free allocation, 2025

231,063 allowances

Allowance position, 2025

126,364 short

Compliance, 2024

A

Permit

VL152B

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Air Liquide Large Industry VTE Jupiter 2Verified emissions and free allocation from 2013 to 2025.0125k250k375k500k2013 verified emissions: 211,225 t2014 verified emissions: 128,452 t2015 verified emissions: 246,628 t2016 verified emissions: 308,784 t2017 verified emissions: 377,007 t2018 verified emissions: 374,744 t2019 verified emissions: 454,623 t2020 verified emissions: 492,303 t2021 verified emissions: 456,149 t2022 verified emissions: 333,851 t2023 verified emissions: 344,542 t2024 verified emissions: 313,032 t2025 verified emissions: 357,427 t2013 free allocation: 340,723 t2014 free allocation: 334,805 t2015 free allocation: 164,409 t2016 free allocation: 322,767 t2017 free allocation: 362,300 t2018 free allocation: 394,323 t2019 free allocation: 386,474 t2020 free allocation: 378,602 t2021 free allocation: 320,572 t2022 free allocation: 320,572 t2023 free allocation: 265,252 t2024 free allocation: 231,063 t2025 free allocation: 231,063 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 357,427 231,063 126,364 short
2024 313,032 231,063 81,969 short
2023 344,542 265,252 79,290 short
2022 333,851 320,572 13,279 short
2021 456,149 320,572 135,577 short
2020 492,303 378,602 113,701 short
2019 454,623 386,474 68,149 short
2018 374,744 394,323 19,579 surplus
2017 377,007 362,300 14,707 short
2016 308,784 322,767 13,983 surplus
2015 246,628 164,409 82,219 short
2014 128,452 334,805 206,353 surplus
2013 211,225 340,723 129,498 surplus

Verified emissions changed by +69.2% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 126,364 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €84.87 (29 September 2026): €10,724,513. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

CBAM context

This activity falls in the hydrogen sector of the Carbon Border Adjustment Mechanism. Free allocation for products covered by the Carbon Border Adjustment Mechanism is being reduced each year under current EU law.

Free allocation remaining for CBAM-covered products, by year
202620272028202920302031203220332034
97.5%95%90%77.5%51.5%39%26.5%14%0%

Share of free allocation remaining for CBAM-covered products, under Directive (EU) 2023/959, Article 10a. It applies to the benchmarks for those products, not necessarily to an installation's whole allocation, so it is not applied to the figures on this page.

Proposed change

A European Commission proposal of 17 July 2026 would restore 15% of the phased-out free allocation for CBAM sectors from 2028 and extend the end of the phase-out from 2034 to 2038. This is a proposal and not yet law.

More on CBAM: the India CBAM Center and what CBAM is and how it works.

Nearby installations

Production of hydrogen and synthesis gas installations in Belgium, largest first.

Questions about Air Liquide Large Industry VTE Jupiter 2

How much did Air Liquide Large Industry VTE Jupiter 2 emit in 2025?

357,427 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Air Liquide Large Industry VTE Jupiter 2 receive?

231,063 in 2025.

Did Air Liquide Large Industry VTE Jupiter 2 surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.