Liberty Engineering Products Ostrava
Liberty Engineering Products Ostrava is a combustion of fuels installation in Czechia. In 2025 it reported 1,263 tonnes of verified emissions against 1,848 free allowances.
Key figures
Country
Activity
Installation ID
CZ 423
Verified emissions, 2025
1,263 tCO₂e
Free allocation, 2025
1,848 allowances
Allowance position, 2025
585 surplus
Compliance, 2024
A
Permit
CZ-0446-11
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 1,263 | 1,848 | 585 surplus |
| 2024 | 894 | 3,755 | 2,861 surplus |
| 2023 | 5,013 | 5,540 | 527 surplus |
| 2022 | 7,256 | 7,419 | 163 surplus |
| 2021 | 9,209 | 7,718 | 1,491 short |
| 2020 | 10,884 | 2,199 | 8,685 short |
| 2019 | 12,612 | 2,245 | 10,367 short |
| 2018 | 13,588 | 2,291 | 11,297 short |
| 2017 | 12,341 | 2,337 | 10,004 short |
| 2016 | 11,179 | 2,382 | 8,797 short |
| 2015 | 9,636 | 2,426 | 7,210 short |
| 2014 | 9,557 | 2,471 | 7,086 short |
| 2013 | 9,248 | 2,514 | 6,734 short |
Verified emissions changed by -86.3% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
Free allocation exceeded verified emissions in 2025, by 585 allowances.
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Czechia, largest first.
- Elektrárna Počerady 4,235,332 t in 2025
- ČEZ, a. s. - Elektrárna Tušimice 2 3,339,956 t in 2025
- ČEZ, a. s. - Elektrárna Prunéřov 2 3,282,768 t in 2025
- ČEZ, a. s. - Elektrárna Ledvice 3,222,548 t in 2025
- Elektrárna Chvaletice 2,250,797 t in 2025
Questions about Liberty Engineering Products Ostrava
How much did Liberty Engineering Products Ostrava emit in 2025?
1,263 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Liberty Engineering Products Ostrava receive?
1,848 in 2025.
Did Liberty Engineering Products Ostrava surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.