Gipsbauplattenwerk Schwarze Pumpe
Gipsbauplattenwerk Schwarze Pumpe is a production or processing of gypsum or plasterboard installation in Germany. In 2025 it reported 29,146 tonnes of verified emissions against 11,079 free allowances.
Key figures
Country
Installation ID
DE 202530
Verified emissions, 2025
29,146 tCO₂e
Free allocation, 2025
11,079 allowances
Allowance position, 2025
18,067 short
Compliance, 2024
A
Permit
14642-0004
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 29,146 | 11,079 | 18,067 short |
| 2024 | 30,689 | 11,225 | 19,464 short |
| 2023 | 25,209 | 11,225 | 13,984 short |
| 2022 | 32,498 | 11,225 | 21,273 short |
| 2021 | 36,004 | 11,327 | 24,677 short |
| 2020 | 35,288 | 25,372 | 9,916 short |
| 2019 | 33,879 | 25,905 | 7,974 short |
| 2018 | 34,345 | 26,437 | 7,908 short |
| 2017 | 34,609 | 26,964 | 7,645 short |
| 2016 | 34,812 | 27,484 | 7,328 short |
| 2015 | 33,142 | 27,999 | 5,143 short |
| 2014 | 31,797 | 28,509 | 3,288 short |
| 2013 | 32,345 | 23,211 | 9,134 short |
Verified emissions changed by -9.9% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 18,067 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €1,533,346. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production or processing of gypsum or plasterboard installations in Germany, largest first.
- Iphofen Werk I 61,546 t in 2025
- Werk Berlin-Brieselang 36,529 t in 2025
- Knauf Deutsche Gipswerke KG Rottleberode 26,622 t in 2025
- Knauf Gips KG Neuss 21,219 t in 2025
- REMONDIS Production- Ofen 7 20,890 t in 2025
Questions about Gipsbauplattenwerk Schwarze Pumpe
How much did Gipsbauplattenwerk Schwarze Pumpe emit in 2025?
29,146 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Gipsbauplattenwerk Schwarze Pumpe receive?
11,079 in 2025.
Did Gipsbauplattenwerk Schwarze Pumpe surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.