In 2025, 1,720 installations reported 263,156,672 tonnes of verified emissions and received 112,504,268 free allowances. 2,188 installations are on record since 2013.
Reporting in 2025
1,720
Verified emissions
263,156,672 t
Free allocation
112,504,268
Allocation as share of emissions
42.8%
Source: European Commission, Union Registry · Data as of 1 April 2026
By activity, 2025
- Combustion of fuels 168,566,189 t · 941
- Production of pig iron or steel 24,161,002 t · 41
- Refining of mineral oil 19,709,616 t · 21
- Production of cement clinker 14,396,921 t · 34
- Production of lime, or calcination of dolomite/magnesite 7,624,700 t · 56
- Production of bulk chemicals 6,068,134 t · 138
- Production of ammonia 3,197,037 t · 5
- Production of paper or cardboard 3,116,978 t · 119
- Production of coke 2,978,951 t · 4
- Manufacture of glass 2,529,254 t · 65
- Production or processing of ferrous metals 2,487,300 t · 60
- Production of hydrogen and synthesis gas 2,393,135 t · 27
- Manufacture of ceramics 1,030,510 t · 109
- Production of primary aluminium 1,012,188 t · 8
- Production of soda ash and sodium bicarbonate 910,863 t · 4
- Production or processing of non-ferrous metals 602,681 t · 15
- Production of secondary aluminium 508,620 t · 9
- Production of carbon black 506,712 t · 4
- Production or processing of gypsum or plasterboard 440,236 t · 36
- Manufacture of mineral wool 327,872 t · 7
- Production of pulp 312,479 t · 6
- Production of nitric acid 121,519 t · 7
- Production of adipic acid 83,210 t · 3
- Metal ore roasting or sintering 70,565 t · 1
Installations
Largest 2025 verified emissions first; installations that did not report in 2025 follow.
- Kraftwerk Neurath 12,074,600 t in 2025
- Kraftwerk Niederaußem 11,356,402 t in 2025
- Kraftwerk Jänschwalde 9,631,288 t in 2025
- Kraftwerk Schwarze Pumpe 8,715,923 t in 2025
- Kraftwerk Weisweiler 8,312,179 t in 2025
- Kraftwerk Boxberg Werk IV 7,421,470 t in 2025
- Kraftwerk Lippendorf 7,336,899 t in 2025
- Integriertes Hüttenwerk Duisburg 6,705,307 t in 2025
- Kraftwerk Boxberg Werk III 5,719,262 t in 2025
- Kraftwerk Schkopau 3,958,812 t in 2025
- Glocke Duisburg 3,901,188 t in 2025
- Grosskraftwerk Mannheim 3,773,541 t in 2025
- Roheisenerzeugung Dillingen 3,646,506 t in 2025
- Glocke Salzgitter 3,497,812 t in 2025
- PCK Raffinerie Glocke Schwedt 3,317,233 t in 2025
- Kraftwerk Hallendorf 3,153,899 t in 2025
- RDK Karlsruhe 2,979,539 t in 2025
- Kraftwerk Datteln Block 4 2,875,406 t in 2025
- RUHR OEL GmbH - Werk Scholven - CO2-Glocke 2,850,419 t in 2025
- Werk 1 und Werk 2 2,593,841 t in 2025
- Kraftwerk Huckingen 2,541,395 t in 2025
- Block 4 Bremen 2,354,855 t in 2025
- Kohlekraftwerk Lünen - TKL 2,319,858 t in 2025
- Einheitliche Anlage Bremen 2,170,849 t in 2025
- Dampfkesselanlage Duisburg Hamborn 2,142,688 t in 2025