Hexanoxidation
Hexanoxidation is a production of bulk chemicals installation in Germany. In 2025 it reported 1 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
DE 202769
Verified emissions, 2025
1 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
1 short
Compliance, 2024
A
Permit
14616-0009
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 1 | none | 1 short |
| 2024 | 1 | none | 1 short |
| 2023 | 1 | none | 1 short |
| 2022 | 1 | none | 1 short |
| 2021 | 1 | none | 1 short |
| 2020 | 1 | none | 1 short |
| 2019 | 1 | none | 1 short |
| 2018 | 1 | none | 1 short |
| 2017 | 1 | none | 1 short |
| 2016 | 1 | none | 1 short |
| 2015 | 2 | none | 2 short |
| 2014 | 0 | none | balanced |
| 2013 | 1 | none | 1 short |
Verified emissions changed by 0% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 1 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €85. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of bulk chemicals installations in Germany, largest first.
- Ethylenanlage (Cracker) Boehlen 867,380 t in 2025
- Kracker 4, Geb. T21 748,653 t in 2025
- Ethylenanlage OM6 648,553 t in 2025
- Kracker 5, Geb. S03 574,863 t in 2025
- Steamcracker 2 492,627 t in 2025
Questions about Hexanoxidation
How much did Hexanoxidation emit in 2025?
1 tonnes of verified emissions, per EU Union Registry compliance data.
Did Hexanoxidation surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.