Imidazol-Fabrik I

Imidazol-Fabrik I is a production of bulk chemicals installation in Germany. In 2025 it reported 0 tonnes of verified emissions against 0 free allowances.

Key figures

Country

Germany

Activity

Production of bulk chemicals

Installation ID

DE 211199

Verified emissions, 2025

0 tCO₂e

Free allocation, 2025

None

Allowance position, 2025

Balanced

Compliance, 2024

A

Permit

14616-0232

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
YearVerified emissions (t) Free allocationPosition
2025 0 none balanced
2024 0 none balanced
2023 0 none balanced
2022 0 none balanced
2021 0 none balanced
2020 0 none balanced
2019 0 none balanced

Source: European Commission, Union Registry ยท Data as of 1 April 2026

Allowance position

Free allocation exceeded verified emissions in 2025.

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production of bulk chemicals installations in Germany, largest first.

Questions about Imidazol-Fabrik I

How much did Imidazol-Fabrik I emit in 2025?

0 tonnes of verified emissions, per EU Union Registry compliance data.

Did Imidazol-Fabrik I surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.