Kalkwerk Istein
Kalkwerk Istein is a production of lime, or calcination of dolomite/magnesite installation in Germany. In 2025 it reported 104,667 tonnes of verified emissions against 62,070 free allowances.
Key figures
Country
Installation ID
DE 133
Verified emissions, 2025
104,667 tCO₂e
Free allocation, 2025
62,070 allowances
Allowance position, 2025
42,597 short
Compliance, 2024
A
Permit
14240-0014
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 104,667 | 62,070 | 42,597 short |
| 2024 | 111,429 | 78,106 | 33,323 short |
| 2023 | 79,337 | 117,508 | 38,171 surplus |
| 2022 | 162,497 | 117,508 | 44,989 short |
| 2021 | 152,817 | 117,508 | 35,309 short |
| 2020 | 170,108 | 250,961 | 80,853 surplus |
| 2019 | 181,301 | 256,128 | 74,827 surplus |
| 2018 | 179,910 | 261,283 | 81,373 surplus |
| 2017 | 180,533 | 266,398 | 85,865 surplus |
| 2016 | 181,861 | 169,877 | 11,984 short |
| 2015 | 113,258 | 86,531 | 26,727 short |
| 2014 | 99,286 | 176,213 | 76,927 surplus |
| 2013 | 114,522 | 179,328 | 64,806 surplus |
Verified emissions changed by -8.6% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 42,597 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €3,659,082. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of lime, or calcination of dolomite/magnesite installations in Germany, largest first.
- Werk Flandersbach-Anlage zum Brennen v. Kalkstein 1,524,797 t in 2025
- Werk Hönnetal - Anl. Z. Brennen v. Kalkstein 604,128 t in 2025
- Kalkofen der Zuckerfabrik Zeitz 330,429 t in 2025
- Kalkbrennanlage Hahnstätten 292,391 t in 2025
- Fels KM DSO 5-8 Seesen 282,092 t in 2025
Questions about Kalkwerk Istein
How much did Kalkwerk Istein emit in 2025?
104,667 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Kalkwerk Istein receive?
62,070 in 2025.
Did Kalkwerk Istein surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.