Warsteiner Kalkwerk
Warsteiner Kalkwerk is a production of lime, or calcination of dolomite/magnesite installation in Germany. In 2025 it reported 139,685 tonnes of verified emissions against 90,250 free allowances.
Key figures
Country
Installation ID
DE 140
Verified emissions, 2025
139,685 tCO₂e
Free allocation, 2025
90,250 allowances
Allowance position, 2025
49,435 short
Compliance, 2024
A
Permit
14240-0022
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 139,685 | 90,250 | 49,435 short |
| 2024 | 119,705 | 90,250 | 29,455 short |
| 2023 | 119,544 | 90,250 | 29,294 short |
| 2022 | 125,709 | 90,250 | 35,459 short |
| 2021 | 150,047 | 90,250 | 59,797 short |
| 2020 | 164,361 | 115,259 | 49,102 short |
| 2019 | 132,462 | 117,629 | 14,833 short |
| 2018 | 147,823 | 119,994 | 27,829 short |
| 2017 | 139,629 | 122,341 | 17,288 short |
| 2016 | 130,599 | 124,675 | 5,924 short |
| 2015 | 137,739 | 126,993 | 10,746 short |
| 2014 | 147,357 | 129,296 | 18,061 short |
| 2013 | 120,628 | 131,582 | 10,954 surplus |
Verified emissions changed by +15.8% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 49,435 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €4,195,548. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of lime, or calcination of dolomite/magnesite installations in Germany, largest first.
- Werk Flandersbach-Anlage zum Brennen v. Kalkstein 1,524,797 t in 2025
- Werk Hönnetal - Anl. Z. Brennen v. Kalkstein 604,128 t in 2025
- Kalkofen der Zuckerfabrik Zeitz 330,429 t in 2025
- Kalkbrennanlage Hahnstätten 292,391 t in 2025
- Fels KM DSO 5-8 Seesen 282,092 t in 2025
Questions about Warsteiner Kalkwerk
How much did Warsteiner Kalkwerk emit in 2025?
139,685 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Warsteiner Kalkwerk receive?
90,250 in 2025.
Did Warsteiner Kalkwerk surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.