Zuckerfabrik Offstein Kalkofen

Zuckerfabrik Offstein Kalkofen is a production of lime, or calcination of dolomite/magnesite installation in Germany. In 2025 it reported 152,244 tonnes of verified emissions against 88,970 free allowances.

Key figures

Country

Germany

Activity

Production of lime, or calcination of dolomite/magnesite

Installation ID

DE 3895

Verified emissions, 2025

152,244 tCO₂e

Free allocation, 2025

88,970 allowances

Allowance position, 2025

63,274 short

Compliance, 2024

A

Permit

14240-0088

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Zuckerfabrik Offstein KalkofenVerified emissions and free allocation from 2013 to 2025.050k100k150k200k2013 verified emissions: 129,804 t2014 verified emissions: 124,305 t2015 verified emissions: 107,683 t2016 verified emissions: 119,494 t2017 verified emissions: 134,363 t2018 verified emissions: 142,764 t2019 verified emissions: 139,375 t2020 verified emissions: 127,097 t2021 verified emissions: 126,739 t2022 verified emissions: 133,777 t2023 verified emissions: 124,647 t2024 verified emissions: 149,671 t2025 verified emissions: 152,244 t2013 free allocation: 122,801 t2014 free allocation: 120,668 t2015 free allocation: 118,510 t2016 free allocation: 116,329 t2017 free allocation: 114,125 t2018 free allocation: 111,900 t2019 free allocation: 109,647 t2020 free allocation: 107,386 t2021 free allocation: 88,970 t2022 free allocation: 88,970 t2023 free allocation: 88,970 t2024 free allocation: 88,970 t2025 free allocation: 88,970 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 152,244 88,970 63,274 short
2024 149,671 88,970 60,701 short
2023 124,647 88,970 35,677 short
2022 133,777 88,970 44,807 short
2021 126,739 88,970 37,769 short
2020 127,097 107,386 19,711 short
2019 139,375 109,647 29,728 short
2018 142,764 111,900 30,864 short
2017 134,363 114,125 20,238 short
2016 119,494 116,329 3,165 short
2015 107,683 118,510 10,827 surplus
2014 124,305 120,668 3,637 short
2013 129,804 122,801 7,003 short

Verified emissions changed by +17.3% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 63,274 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €85.90 (28 September 2026): €5,435,237. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production of lime, or calcination of dolomite/magnesite installations in Germany, largest first.

Questions about Zuckerfabrik Offstein Kalkofen

How much did Zuckerfabrik Offstein Kalkofen emit in 2025?

152,244 tonnes of verified emissions, per EU Union Registry compliance data.

How many free allowances did Zuckerfabrik Offstein Kalkofen receive?

88,970 in 2025.

Did Zuckerfabrik Offstein Kalkofen surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.