BC Power
BC Power is a combustion of fuels installation in Hungary. In 2025 it reported 203,444 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
HU 220442
Verified emissions, 2025
203,444 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
203,444 short
Compliance, 2024
A
Permit
UHG9568-1-23
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 203,444 | none | 203,444 short |
| 2024 | 178,901 | none | 178,901 short |
| 2023 | 106,859 | none | 106,859 short |
Verified emissions changed by +90.4% from 2023 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 203,444 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €17,475,840. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Hungary, largest first.
- MVM Mátra Energia ZRt. Visontai Erőmű 1,591,982 t in 2025
- MOL Nyrt. Dunai Finomító 1,406,088 t in 2025
- Gönyűi Kombinált Ciklusú Erőmű 686,765 t in 2025
- Dunamenti Erőmű Zrt. 675,808 t in 2025
- BERT Rt. Kelenföldi Komb.Cikl. Gázt.Hoszolg. Eromu 249,389 t in 2025
Questions about BC Power
How much did BC Power emit in 2025?
203,444 tonnes of verified emissions, per EU Union Registry compliance data.
Did BC Power surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.