Uniper HWC Kop van Zuid
Uniper HWC Kop van Zuid is a combustion of fuels installation in Netherlands. In 2025 it reported 1,161 tonnes of verified emissions against 953 free allowances.
Key figures
Country
Activity
Installation ID
NL 224
Verified emissions, 2025
1,161 tCO₂e
Free allocation, 2025
953 allowances
Allowance position, 2025
208 short
Compliance, 2024
A
Permit
NL-200400159
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 1,161 | 953 | 208 short |
| 2024 | 8,098 | 0 | 8,098 short |
| 2023 | none | 0 | |
| 2022 | none | 0 | |
| 2021 | none | 0 | |
| 2020 | 18 | 0 | 18 short |
| 2019 | 938 | 0 | 938 short |
| 2018 | 182 | 0 | 182 short |
| 2017 | 100 | 0 | 100 short |
| 2016 | 128 | 0 | 128 short |
| 2015 | 626 | 924 | 298 surplus |
| 2014 | 1,249 | 4,172 | 2,923 surplus |
| 2013 | 5,971 | 4,663 | 1,308 short |
Verified emissions changed by -80.6% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 208 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €17,867. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Netherlands, largest first.
- Vattenfall Power Velsen 3,745,786 t in 2025
- RWE Eemshaven Centrale 3,596,911 t in 2025
- Chemelot BKG 01 2,820,546 t in 2025
- Power Plant Rotterdam B.V. 2,223,444 t in 2025
- Uniper Centrale Maasvlakte 2,001,910 t in 2025
Questions about Uniper HWC Kop van Zuid
How much did Uniper HWC Kop van Zuid emit in 2025?
1,161 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Uniper HWC Kop van Zuid receive?
953 in 2025.
Did Uniper HWC Kop van Zuid surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.