Equinor Energy Gullfaksfeltet
Equinor Energy Gullfaksfeltet is a combustion of fuels installation in Norway. In 2025 it reported 551,845 tonnes of verified emissions against 134,160 free allowances.
Key figures
Country
Activity
Installation ID
NO 86
Verified emissions, 2025
551,845 tCO₂e
Free allocation, 2025
134,160 allowances
Allowance position, 2025
417,685 short
Compliance, 2024
A
Permit
NO-2007-1072
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 551,845 | 134,160 | 417,685 short |
| 2024 | 536,892 | 134,160 | 402,732 short |
| 2023 | 561,897 | 134,160 | 427,737 short |
| 2022 | 610,415 | 165,047 | 445,368 short |
| 2021 | 781,154 | 198,088 | 583,066 short |
| 2020 | 739,646 | 437,593 | 302,053 short |
| 2019 | 873,721 | 446,806 | 426,915 short |
| 2018 | 930,679 | 455,988 | 474,691 short |
| 2017 | 905,115 | 465,057 | 440,058 short |
| 2016 | 892,815 | 474,038 | 418,777 short |
| 2015 | 949,492 | 482,924 | 466,568 short |
| 2014 | 976,947 | 491,717 | 485,230 short |
| 2013 | 992,145 | 500,409 | 491,736 short |
Verified emissions changed by -44.4% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 417,685 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €35,448,926. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Norway, largest first.
- Equinor Energy Osebergfeltet 975,494 t in 2025
- Equinor Energy Statfjordfeltet 806,819 t in 2025
- ConocoPhillips Skandinavia AS Ekofiskområdet 772,394 t in 2025
- Equinor Energy Åsgardfeltet 763,326 t in 2025
- Gassco AS Kårstø gassprosesseringsanlegg 721,095 t in 2025
Questions about Equinor Energy Gullfaksfeltet
How much did Equinor Energy Gullfaksfeltet emit in 2025?
551,845 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Equinor Energy Gullfaksfeltet receive?
134,160 in 2025.
Did Equinor Energy Gullfaksfeltet surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.