Cogeneración de Refinería La Rábida
Cogeneración de Refinería La Rábida is a combustion of fuels installation in Spain. In 2025 it reported 273,498 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
ES 66
Verified emissions, 2025
273,498 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
273,498 short
Compliance, 2024
A
Permit
ES012102000074
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 273,498 | none | 273,498 short |
| 2024 | 294,629 | none | 294,629 short |
| 2023 | 284,274 | none | 284,274 short |
| 2022 | 298,509 | none | 298,509 short |
| 2021 | 296,438 | none | 296,438 short |
| 2020 | 300,399 | none | 300,399 short |
| 2019 | 304,414 | none | 304,414 short |
| 2018 | 309,003 | none | 309,003 short |
| 2017 | 299,726 | none | 299,726 short |
| 2016 | 283,949 | none | 283,949 short |
| 2015 | 282,312 | none | 282,312 short |
| 2014 | 309,580 | none | 309,580 short |
| 2013 | 323,783 | none | 323,783 short |
Verified emissions changed by -15.5% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 273,498 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €23,211,775. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Spain, largest first.
- Aboño Generaciones Eléctricas, S.L.U. 2,642,623 t in 2025
- Unión Eléctr. de Canarias Generación-CT Granadilla 1,989,419 t in 2025
- Unión Eléct.Canarias Generac.-CT Barranco Tirajana 1,660,505 t in 2025
- CCC - Cartagena 1,133,989 t in 2025
- CCC. - Sagunto 1,085,196 t in 2025
Questions about Cogeneración de Refinería La Rábida
How much did Cogeneración de Refinería La Rábida emit in 2025?
273,498 tonnes of verified emissions, per EU Union Registry compliance data.
Did Cogeneración de Refinería La Rábida surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.