Ercros, S.A. - Fabrica de Vilaseca II
Ercros, S.A. - Fabrica de Vilaseca II is a production of bulk chemicals installation in Spain. In 2025 it reported 74,680 tonnes of verified emissions against 34,816 free allowances.
Key figures
Country
Activity
Installation ID
ES 921
Verified emissions, 2025
74,680 tCO₂e
Free allocation, 2025
34,816 allowances
Allowance position, 2025
39,864 short
Compliance, 2024
A
Permit
ES084301001078
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 74,680 | 34,816 | 39,864 short |
| 2024 | 71,684 | 34,816 | 36,868 short |
| 2023 | 79,784 | 34,816 | 44,968 short |
| 2022 | 69,691 | 34,816 | 34,875 short |
| 2021 | 83,236 | 34,816 | 48,420 short |
| 2020 | 75,567 | 39,509 | 36,058 short |
| 2019 | 83,139 | 40,341 | 42,798 short |
| 2018 | 82,467 | 41,171 | 41,296 short |
| 2017 | 88,135 | 41,989 | 46,146 short |
| 2016 | 89,620 | 42,800 | 46,820 short |
| 2015 | 118,235 | 43,602 | 74,633 short |
| 2014 | 115,454 | 44,396 | 71,058 short |
| 2013 | 135,579 | 45,181 | 90,398 short |
Verified emissions changed by -44.9% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 39,864 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €3,424,318. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of bulk chemicals installations in Spain, largest first.
- Dow Chemical Ibérica, SL - La Pobla de Mafumet 884,346 t in 2025
- Repsol Química, S.A. - El Morell - Cogeneración 729,872 t in 2025
- Fábrica Puente de mayorga 219,477 t in 2025
- Fábrica de Palos de la Frontera 149,739 t in 2025
- Indústrias Químicas del Óxido de Etileno, S.A. 109,709 t in 2025
Questions about Ercros, S.A. - Fabrica de Vilaseca II
How much did Ercros, S.A. - Fabrica de Vilaseca II emit in 2025?
74,680 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Ercros, S.A. - Fabrica de Vilaseca II receive?
34,816 in 2025.
Did Ercros, S.A. - Fabrica de Vilaseca II surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.