Repsol Química, S.A. - El Morell - Cogeneración
Repsol Química, S.A. - El Morell - Cogeneración is a production of bulk chemicals installation in Spain. In 2025 it reported 729,872 tonnes of verified emissions against 412,477 free allowances.
Key figures
Country
Activity
Installation ID
ES 427
Verified emissions, 2025
729,872 tCO₂e
Free allocation, 2025
412,477 allowances
Allowance position, 2025
317,395 short
Compliance, 2024
A
Permit
ES084301000511
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 729,872 | 412,477 | 317,395 short |
| 2024 | 763,749 | 454,989 | 308,760 short |
| 2023 | 834,101 | 454,989 | 379,112 short |
| 2022 | 833,472 | 454,989 | 378,483 short |
| 2021 | 876,889 | 454,989 | 421,900 short |
| 2020 | 832,579 | 639,696 | 192,883 short |
| 2019 | 854,563 | 653,164 | 201,399 short |
| 2018 | 782,135 | 666,586 | 115,549 short |
| 2017 | 841,202 | 679,844 | 161,358 short |
| 2016 | 826,422 | 692,973 | 133,449 short |
| 2015 | 829,803 | 705,962 | 123,841 short |
| 2014 | 796,318 | 718,819 | 77,499 short |
| 2013 | 688,416 | 731,524 | 43,108 surplus |
Verified emissions changed by +6% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 317,395 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €26,937,314. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production of bulk chemicals installations in Spain, largest first.
- Dow Chemical Ibérica, SL - La Pobla de Mafumet 884,346 t in 2025
- Fábrica Puente de mayorga 219,477 t in 2025
- Fábrica de Palos de la Frontera 149,739 t in 2025
- Indústrias Químicas del Óxido de Etileno, S.A. 109,709 t in 2025
- Ercros, S.A. - Fabrica de Vilaseca II 74,680 t in 2025
Questions about Repsol Química, S.A. - El Morell - Cogeneración
How much did Repsol Química, S.A. - El Morell - Cogeneración emit in 2025?
729,872 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Repsol Química, S.A. - El Morell - Cogeneración receive?
412,477 in 2025.
Did Repsol Química, S.A. - El Morell - Cogeneración surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.