INSTITUCIÓN FERIAL DE MADRID
INSTITUCIÓN FERIAL DE MADRID is a combustion of fuels installation in Spain. In 2025 it reported 2,497 tonnes of verified emissions against 514 free allowances.
Key figures
Country
Activity
Installation ID
ES 214580
Verified emissions, 2025
2,497 tCO₂e
Free allocation, 2025
514 allowances
Allowance position, 2025
1,983 short
Compliance, 2024
A
Permit
ES15281C20-62200
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 2,497 | 514 | 1,983 short |
| 2024 | 2,218 | 629 | 1,589 short |
| 2023 | 2,855 | 538 | 2,317 short |
| 2022 | 2,783 | 551 | 2,232 short |
| 2021 | 1,804 | 563 | 1,241 short |
| 2020 | 2,455 | 644 | 1,811 short |
Verified emissions changed by +1.7% from 2020 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 1,983 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €170,340. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Spain, largest first.
- Aboño Generaciones Eléctricas, S.L.U. 2,642,623 t in 2025
- Unión Eléctr. de Canarias Generación-CT Granadilla 1,989,419 t in 2025
- Unión Eléct.Canarias Generac.-CT Barranco Tirajana 1,660,505 t in 2025
- CCC - Cartagena 1,133,989 t in 2025
- CCC. - Sagunto 1,085,196 t in 2025
Questions about INSTITUCIÓN FERIAL DE MADRID
How much did INSTITUCIÓN FERIAL DE MADRID emit in 2025?
2,497 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did INSTITUCIÓN FERIAL DE MADRID receive?
514 in 2025.
Did INSTITUCIÓN FERIAL DE MADRID surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.