Unión Eléctrica de Canarias Generación-T.G.G.Isora

Unión Eléctrica de Canarias Generación-T.G.G.Isora is a combustion of fuels installation in Spain. In 2025 it reported 11,681 tonnes of verified emissions against 0 free allowances.

Key figures

Country

Spain

Activity

Combustion of fuels

Installation ID

ES 90048

Verified emissions, 2025

11,681 tCO₂e

Free allocation, 2025

None

Allowance position, 2025

11,681 short

Compliance, 2024

A

Permit

ES043801001347

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of Unión Eléctrica de Canarias Generación-T.G.G.IsoraVerified emissions and free allocation from 2013 to 2025.05k10k15k20k2013 verified emissions: 9,053 t2014 verified emissions: 11,643 t2015 verified emissions: 11,912 t2016 verified emissions: 12,606 t2017 verified emissions: 13,661 t2018 verified emissions: 12,813 t2019 verified emissions: 13,795 t2020 verified emissions: 11,596 t2021 verified emissions: 10,629 t2022 verified emissions: 12,683 t2023 verified emissions: 12,262 t2024 verified emissions: 12,306 t2025 verified emissions: 11,681 t2013201520172019202120232025
YearVerified emissions (t) Free allocationPosition
2025 11,681 none 11,681 short
2024 12,306 none 12,306 short
2023 12,262 none 12,262 short
2022 12,683 none 12,683 short
2021 10,629 none 10,629 short
2020 11,596 none 11,596 short
2019 13,795 none 13,795 short
2018 12,813 none 12,813 short
2017 13,661 none 13,661 short
2016 12,606 none 12,606 short
2015 11,912 none 11,912 short
2014 11,643 none 11,643 short
2013 9,053 none 9,053 short

Verified emissions changed by +29% from 2013 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 11,681 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €84.87 (29 September 2026): €991,366. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Combustion of fuels installations in Spain, largest first.

Questions about Unión Eléctrica de Canarias Generación-T.G.G.Isora

How much did Unión Eléctrica de Canarias Generación-T.G.G.Isora emit in 2025?

11,681 tonnes of verified emissions, per EU Union Registry compliance data.

Did Unión Eléctrica de Canarias Generación-T.G.G.Isora surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.