Tallbacken
Tallbacken is a combustion of fuels installation in Sweden. In 2025 it reported 5 tonnes of verified emissions against 1 free allowances.
Key figures
Country
Activity
Installation ID
SE 287
Verified emissions, 2025
5 tCO₂e
Free allocation, 2025
1 allowances
Allowance position, 2025
4 short
Compliance, 2024
A
Permit
06-563-015273-2004
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 5 | 1 | 4 short |
| 2024 | 60 | 1 | 59 short |
| 2023 | 3 | 1 | 2 short |
| 2022 | 0 | 1 | 1 surplus |
| 2021 | 6 | 1 | 5 short |
| 2020 | 4 | 0 | 4 short |
| 2019 | 1 | 0 | 1 short |
| 2018 | 7 | 0 | 7 short |
| 2017 | 36 | 0 | 36 short |
| 2016 | 3 | 0 | 3 short |
| 2015 | 0 | 0 | balanced |
| 2014 | 6 | 297 | 291 surplus |
| 2013 | 3 | 332 | 329 surplus |
Verified emissions changed by +66.7% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 4 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €339. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Sweden, largest first.
- Krackeranläggningen 585,134 t in 2025
- Gärstadverket 324,458 t in 2025
- Högdalen P1-P5 306,800 t in 2025
- Sysavs avfallsförbränningsanläggning 281,049 t in 2025
- Renovas avfallsförbränningsanläggning 247,037 t in 2025
Questions about Tallbacken
How much did Tallbacken emit in 2025?
5 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Tallbacken receive?
1 in 2025.
Did Tallbacken surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.