10 MW wind power project by Powerica at BDS - Gujarat

Registry Record

Registry

Verra

Project ID

VCS1822

Country

India

Category

Renewable Energy

Methodology

ams-i-d

Status

Registered

Credits Issued

171,054 tCO₂e

Credits Retired

103,576 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2017 to 2022: 171,054 tonnes issued and 103,576 retired.012.5k25k37.5k50k2017 issued: 26,434 tonnes2017 retired: 26,434 tonnes20172018 issued: 30,334 tonnes2018 retired: 29,440 tonnes20182019 issued: 30,642 tonnes2019 retired: 30,642 tonnes20192020 issued: 27,747 tonnes2020 retired: 2,059 tonnes20202021 issued: 28,757 tonnes2021 retired: 15,001 tonnes20212022 issued: 27,140 tonnes2022
VintageIssued (tCO₂e)Retired (tCO₂e)
202227,140none
202128,75715,001
202027,7472,059
201930,64230,642
201830,33429,440
201726,43426,434

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • AMS-I.D. - Grid connected renewable electricity generation - 1.0-18.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesCannot be confirmed from available dataCredits issued for vintages 2021 to 2022. The start of the first crediting period is not in registry data.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesCannot be confirmed from available dataCredits issued for vintages 2021 to 2022. The start of the first crediting period is not in registry data.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

India and Article 6

Bilateral agreements
2
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

No organisation named as beneficiary in registry records.

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

10 MW wind power project by Powerica at BDS - Gujarat is registered with Verra under the ams-i-d protocol, located in India. As of 1 June 2026, registry records show 171,054 tonnes issued and 103,576 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has 10 MW wind power project by Powerica at BDS - Gujarat issued?

171,054 tonnes of credits have been issued and 103,576 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Registry data as of June 1, 2026