Akcay 28.78 MW, Hydroelectric Power Plant Project (HEPP), Turkey

Registry Record

Registry

Verra

Project ID

VCS1174

Country

Türkiye

Category

Renewable Energy

Methodology

acm0002

Status

Registered

Credits Issued

327,782 tCO₂e

Credits Retired

140,931 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2009 to 2023: 327,782 tonnes issued and 140,931 retired.025k50k75k100k2009 issued: 2,726 tonnes2009 retired: 2,726 tonnes20092010 issued: 5,310 tonnes2010 retired: 5,310 tonnes2011 issued: 13,252 tonnes2011 retired: 6,059 tonnes20112013 issued: 35,713 tonnes2013 retired: 35,713 tonnes2014 issued: 29,352 tonnes2014 retired: 29,352 tonnes20142015 issued: 75,681 tonnes2016 issued: 28,917 tonnes20162017 issued: 23,058 tonnes2017 retired: 12,199 tonnes2018 issued: 20,079 tonnes2018 retired: 20,079 tonnes20182019 issued: 37,438 tonnes2019 retired: 29,493 tonnes2020 issued: 16,444 tonnes20202021 issued: 8,566 tonnes2022 issued: 22,241 tonnes20222023 issued: 9,005 tonnes2023
VintageIssued (tCO₂e)Retired (tCO₂e)
20239,005none
202222,241none
20218,566none
202016,444none
201937,43829,493
201820,07920,079
201723,05812,199
201628,917none
201575,681none
201429,35229,352
201335,71335,713
201113,2526,059
20105,3105,310
20092,7262,726

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Türkiye and Article 6

Bilateral agreements
0
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Not published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

60.4% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Toucan85,1442021

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Akcay 28.78 MW, Hydroelectric Power Plant Project (HEPP), Turkey is registered with Verra under the acm0002 protocol, located in Türkiye. As of 1 June 2026, registry records show 327,782 tonnes issued and 140,931 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Akcay 28.78 MW, Hydroelectric Power Plant Project (HEPP), Turkey issued?

327,782 tonnes of credits have been issued and 140,931 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Akcay 28.78 MW, Hydroelectric Power Plant Project (HEPP), Turkey?

Registry records name 1 organisation: Toucan. Many retirements name no beneficiary.

Registry data as of June 1, 2026