Chuanwei Group 24 MW Waste Gas based Captive Power Plant

Registry Record

Registry

Verra

Project ID

VCS12

Country

China

Category

Renewable Energy

Methodology

acm0002

Status

Not stated

Credits Issued

1,162,620 tCO₂e

Credits Retired

984,386 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2007 to 2016: 1,162,620 tonnes issued and 984,386 retired.050k100k150k200k2007 issued: 136,692 tonnes2007 retired: 136,692 tonnes20072008 issued: 100,513 tonnes2008 retired: 100,513 tonnes20082011 issued: 49,747 tonnes2011 retired: 49,747 tonnes20112012 issued: 198,338 tonnes2012 retired: 198,338 tonnes20122013 issued: 192,056 tonnes2013 retired: 150,865 tonnes20132014 issued: 188,503 tonnes2014 retired: 147,628 tonnes20142015 issued: 192,630 tonnes2015 retired: 107,462 tonnes20152016 issued: 104,141 tonnes2016 retired: 93,141 tonnes2016
VintageIssued (tCO₂e)Retired (tCO₂e)
2016104,14193,141
2015192,630107,462
2014188,503147,628
2013192,056150,865
2012198,338198,338
201149,74749,747
2008100,513100,513
2007136,692136,692

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2007, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2007, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

China and Article 6

Bilateral agreements
0
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Not published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

74.6% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Toucan392,3582021
HSBC222,0852012
Shaw Industries120,3402021

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Chuanwei Group 24 MW Waste Gas based Captive Power Plant is registered with Verra under the acm0002 protocol, located in China. As of 1 June 2026, registry records show 1,162,620 tonnes issued and 984,386 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Chuanwei Group 24 MW Waste Gas based Captive Power Plant issued?

1,162,620 tonnes of credits have been issued and 984,386 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Chuanwei Group 24 MW Waste Gas based Captive Power Plant?

Registry records name 3 organisations, including Toucan, HSBC, Shaw Industries. Many retirements name no beneficiary.

Registry data as of June 1, 2026