Gullubag 96 MW Hydro Electric Power Plant Project, Turkey

Registry Record

Registry

Verra

Project ID

VCS391

Country

Türkiye

Category

Renewable Energy

Methodology

acm0002

Status

Registered

Credits Issued

1,053,868 tCO₂e

Credits Retired

714,455 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2012 to 2022: 1,053,868 tonnes issued and 714,455 retired.050k100k150k200k2012 issued: 112,334 tonnes2012 retired: 23,000 tonnes20122013 issued: 138,920 tonnes2013 retired: 138,920 tonnes20132014 issued: 68,606 tonnes2014 retired: 68,606 tonnes20142015 issued: 92,690 tonnes2015 retired: 92,690 tonnes20152016 issued: 162,035 tonnes2016 retired: 162,035 tonnes20162017 issued: 129,771 tonnes2017 retired: 129,771 tonnes20172018 issued: 148,565 tonnes2018 retired: 1,000 tonnes20182019 issued: 147,097 tonnes2019 retired: 97,433 tonnes20192020 issued: 38,924 tonnes2020 retired: 1,000 tonnes20202022 issued: 14,926 tonnes2022
VintageIssued (tCO₂e)Retired (tCO₂e)
202214,926none
202038,9241,000
2019147,09797,433
2018148,5651,000
2017129,771129,771
2016162,035162,035
201592,69092,690
201468,60668,606
2013138,920138,920
2012112,33423,000

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2012, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2012, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Türkiye and Article 6

Bilateral agreements
0
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Not published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

15.5% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Toucan110,9212021

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Gullubag 96 MW Hydro Electric Power Plant Project, Turkey is registered with Verra under the acm0002 protocol, located in Türkiye. As of 1 June 2026, registry records show 1,053,868 tonnes issued and 714,455 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Gullubag 96 MW Hydro Electric Power Plant Project, Turkey issued?

1,053,868 tonnes of credits have been issued and 714,455 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Gullubag 96 MW Hydro Electric Power Plant Project, Turkey?

Registry records name 1 organisation: Toucan. Many retirements name no beneficiary.

Registry data as of June 1, 2026