Natural Gas Based Grid Connected Combined Cycle Power Generation by TANGEDCO.

Registry Record

Registry

Verra

Project ID

VCS696

Country

India

Category

Fuel Switching

Methodology

am0029

Status

Not stated

Credits Issued

170,473 tCO₂e

Credits Retired

170,473 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2008 to 2010: 170,473 tonnes issued and 170,473 retired.050k100k150k200k2008 issued: 21,512 tonnes2008 retired: 21,512 tonnes20082010 issued: 148,961 tonnes2010 retired: 148,961 tonnes2010
VintageIssued (tCO₂e)Retired (tCO₂e)
2010148,961148,961
200821,51221,512

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

No ICVCM decision on this methodology yet.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2008, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2008, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

India and Article 6

Bilateral agreements
2
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

No organisation named as beneficiary in registry records.

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Natural Gas Based Grid Connected Combined Cycle Power Generation by TANGEDCO. is registered with Verra under the am0029 protocol, located in India. As of 1 June 2026, registry records show 170,473 tonnes issued and 170,473 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Natural Gas Based Grid Connected Combined Cycle Power Generation by TANGEDCO. issued?

170,473 tonnes of credits have been issued and 170,473 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

No ICVCM decision on this methodology yet. The CCP label is applied to credits by the registry, issuance by issuance.

Registry data as of June 1, 2026