Wind Power Project at Theni by Powerica Limited

Registry Record

Registry

Verra

Project ID

VCS1830

Country

India

Category

Renewable Energy

Methodology

ams-i-d

Status

Registered

Credits Issued

172,406 tCO₂e

Credits Retired

147,485 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2010 to 2023: 172,406 tonnes issued and 147,485 retired.05k10k15k20k2010 issued: 2,722 tonnes2010 retired: 59 tonnes20102011 issued: 1,213 tonnes2011 retired: 1,213 tonnes2012 issued: 752 tonnes2012 retired: 752 tonnes20122013 issued: 17,216 tonnes2013 retired: 17,216 tonnes2014 issued: 15,871 tonnes2014 retired: 15,871 tonnes20142015 issued: 11,353 tonnes2015 retired: 11,353 tonnes2016 issued: 19,099 tonnes2016 retired: 19,099 tonnes20162017 issued: 18,933 tonnes2017 retired: 18,933 tonnes2018 issued: 16,532 tonnes2018 retired: 16,532 tonnes20182019 issued: 15,532 tonnes2019 retired: 15,532 tonnes2020 issued: 15,721 tonnes2020 retired: 15,721 tonnes20202021 issued: 15,598 tonnes2021 retired: 13,789 tonnes2022 issued: 16,570 tonnes2022 retired: 1,415 tonnes20222023 issued: 5,294 tonnes2023
VintageIssued (tCO₂e)Retired (tCO₂e)
20235,294none
202216,5701,415
202115,59813,789
202015,72115,721
201915,53215,532
201816,53216,532
201718,93318,933
201619,09919,099
201511,35311,353
201415,87115,871
201317,21617,216
2012752752
20111,2131,213
20102,72259

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • AMS-I.D. - Grid connected renewable electricity generation - 1.0-18.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2010, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2010, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

India and Article 6

Bilateral agreements
2
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

No organisation named as beneficiary in registry records.

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Wind Power Project at Theni by Powerica Limited is registered with Verra under the ams-i-d protocol, located in India. As of 1 June 2026, registry records show 172,406 tonnes issued and 147,485 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Wind Power Project at Theni by Powerica Limited issued?

172,406 tonnes of credits have been issued and 147,485 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Registry data as of June 1, 2026