Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project

Registry Record

Registry

Verra

Project ID

VCS1741

Country

Türkiye

Category

Renewable Energy

Methodology

acm0002

Status

Registered

Credits Issued

83,856 tCO₂e

Credits Retired

31,489 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2016 to 2021: 83,856 tonnes issued and 31,489 retired.012.5k25k37.5k50k2016 issued: 306 tonnes2016 retired: 170 tonnes20162017 issued: 17,020 tonnes2017 retired: 4,000 tonnes20172018 issued: 20,738 tonnes20182019 issued: 20,483 tonnes2019 retired: 6,829 tonnes20192020 issued: 17,144 tonnes2020 retired: 14,166 tonnes20202021 issued: 8,165 tonnes2021 retired: 6,324 tonnes2021
VintageIssued (tCO₂e)Retired (tCO₂e)
20218,1656,324
202017,14414,166
201920,4836,829
201820,738none
201717,0204,000
2016306170

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesCannot be confirmed from available dataCredits issued for vintage 2021. The start of the first crediting period is not in registry data.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesCannot be confirmed from available dataCredits issued for vintage 2021. The start of the first crediting period is not in registry data.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Türkiye and Article 6

Bilateral agreements
0
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Not published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

No organisation named as beneficiary in registry records.

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project is registered with Verra under the acm0002 protocol, located in Türkiye. As of 1 June 2026, registry records show 83,856 tonnes issued and 31,489 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project issued?

83,856 tonnes of credits have been issued and 31,489 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Registry data as of June 1, 2026