Dampfkessel Dormagen M 75
Dampfkessel Dormagen M 75 is a combustion of fuels installation in Germany. In 2025 it reported 102,965 tonnes of verified emissions against 75,200 free allowances.
Key figures
Country
Activity
Installation ID
DE 208944
Verified emissions, 2025
102,965 tCO₂e
Free allocation, 2025
75,200 allowances
Allowance position, 2025
27,765 short
Compliance, 2024
A
Permit
14310-1887
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 102,965 | 75,200 | 27,765 short |
| 2024 | 135,971 | 50,211 | 85,760 short |
| 2023 | 114,046 | 38,920 | 75,126 short |
| 2022 | 55,913 | 52,622 | 3,291 short |
| 2021 | 87,468 | 52,422 | 35,046 short |
| 2020 | 84,975 | 69,853 | 15,122 short |
| 2019 | 86,564 | 71,577 | 14,987 short |
| 2018 | 117,815 | 73,314 | 44,501 short |
| 2017 | 50,403 | 75,063 | 24,660 surplus |
| 2016 | 12,818 | 11,788 | 1,030 short |
Verified emissions changed by +703.3% from 2016 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 27,765 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €2,356,416. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Germany, largest first.
- Kraftwerk Neurath 12,074,600 t in 2025
- Kraftwerk Niederaußem 11,356,402 t in 2025
- Kraftwerk Jänschwalde 9,631,288 t in 2025
- Kraftwerk Schwarze Pumpe 8,715,923 t in 2025
- Kraftwerk Weisweiler 8,312,179 t in 2025
Questions about Dampfkessel Dormagen M 75
How much did Dampfkessel Dormagen M 75 emit in 2025?
102,965 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Dampfkessel Dormagen M 75 receive?
75,200 in 2025.
Did Dampfkessel Dormagen M 75 surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.