Etex BP GmbH - Siniat Werk Peitz
Etex BP GmbH - Siniat Werk Peitz is a production or processing of gypsum or plasterboard installation in Germany. In 2025 it reported 13,791 tonnes of verified emissions against 5,560 free allowances.
Key figures
Country
Installation ID
DE 203603
Verified emissions, 2025
13,791 tCO₂e
Free allocation, 2025
5,560 allowances
Allowance position, 2025
8,231 short
Compliance, 2024
A
Permit
14642-0015
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 13,791 | 5,560 | 8,231 short |
| 2024 | 13,489 | 6,946 | 6,543 short |
| 2023 | 19,007 | 7,378 | 11,629 short |
| 2022 | 23,132 | 8,228 | 14,904 short |
| 2021 | 27,627 | 8,228 | 19,399 short |
| 2020 | 24,704 | 24,040 | 664 short |
| 2019 | 26,772 | 24,547 | 2,225 short |
| 2018 | 21,025 | 25,051 | 4,026 surplus |
| 2017 | 21,513 | 25,549 | 4,036 surplus |
| 2016 | 20,413 | 26,042 | 5,629 surplus |
| 2015 | 21,597 | 26,530 | 4,933 surplus |
| 2014 | 22,707 | 27,013 | 4,306 surplus |
| 2013 | 22,744 | 21,993 | 751 short |
Verified emissions changed by -39.4% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 8,231 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €707,043. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production or processing of gypsum or plasterboard installations in Germany, largest first.
- Iphofen Werk I 61,546 t in 2025
- Werk Berlin-Brieselang 36,529 t in 2025
- Gipsbauplattenwerk Schwarze Pumpe 29,146 t in 2025
- Knauf Deutsche Gipswerke KG Rottleberode 26,622 t in 2025
- Knauf Gips KG Neuss 21,219 t in 2025
Questions about Etex BP GmbH - Siniat Werk Peitz
How much did Etex BP GmbH - Siniat Werk Peitz emit in 2025?
13,791 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Etex BP GmbH - Siniat Werk Peitz receive?
5,560 in 2025.
Did Etex BP GmbH - Siniat Werk Peitz surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.