Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn
Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn is a combustion of fuels installation in Germany. In 2025 it reported 311 tonnes of verified emissions against 75 free allowances.
Key figures
Country
Activity
Installation ID
DE 1821
Verified emissions, 2025
311 tCO₂e
Free allocation, 2025
75 allowances
Allowance position, 2025
236 short
Compliance, 2024
A
Permit
14330-0022
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 311 | 75 | 236 short |
| 2024 | 253 | 2,327 | 2,074 surplus |
| 2023 | 473 | 2,327 | 1,854 surplus |
| 2022 | 19,778 | 147 | 19,631 short |
| 2021 | 715 | 147 | 568 short |
| 2020 | 1,088 | 61 | 1,027 short |
| 2019 | 260 | 76 | 184 short |
| 2018 | 1,147 | 92 | 1,055 short |
| 2017 | 4,076 | 109 | 3,967 short |
| 2016 | 1,572 | 126 | 1,446 short |
| 2015 | 4,523 | 144 | 4,379 short |
| 2014 | 310 | 5,022 | 4,712 surplus |
| 2013 | 5,960 | 5,610 | 350 short |
Verified emissions changed by -94.8% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 236 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €20,272. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Germany, largest first.
- Kraftwerk Neurath 12,074,600 t in 2025
- Kraftwerk Niederaußem 11,356,402 t in 2025
- Kraftwerk Jänschwalde 9,631,288 t in 2025
- Kraftwerk Schwarze Pumpe 8,715,923 t in 2025
- Kraftwerk Weisweiler 8,312,179 t in 2025
Questions about Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn
How much did Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn emit in 2025?
311 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn receive?
75 in 2025.
Did Mittel-Europ.-Gasleitungs-GmbH Werk Mittelbrunn surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.