REA-Gips Anlage
REA-Gips Anlage is a production or processing of gypsum or plasterboard installation in Germany. It last reported verified emissions for 2024: 15,139 tonnes.
Key figures
Country
Installation ID
DE 224964
Verified emissions, 2024
15,139 tCO₂e
Free allocation, 2024
None
Allowance position, 2024
Not available
Compliance, 2024
A
Permit
14642-0045
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2024 | 15,139 | none | 15,139 short |
Source: European Commission, Union Registry ยท Data as of 1 April 2026
Allowance position
No verified emissions were reported for 2025, so there is no position for the latest year.
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production or processing of gypsum or plasterboard installations in Germany, largest first.
- Iphofen Werk I 61,546 t in 2025
- Werk Berlin-Brieselang 36,529 t in 2025
- Gipsbauplattenwerk Schwarze Pumpe 29,146 t in 2025
- Knauf Deutsche Gipswerke KG Rottleberode 26,622 t in 2025
- Knauf Gips KG Neuss 21,219 t in 2025
Questions about REA-Gips Anlage
How much did REA-Gips Anlage emit in 2024?
15,139 tonnes of verified emissions, per EU Union Registry compliance data.
Did REA-Gips Anlage surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.