REMONDIS Production- Alphagips Produktionsanlage

REMONDIS Production- Alphagips Produktionsanlage is a production or processing of gypsum or plasterboard installation in Germany. In 2025 it reported 2 tonnes of verified emissions against 0 free allowances.

Key figures

Country

Germany

Activity

Production or processing of gypsum or plasterboard

Installation ID

DE 229271

Verified emissions, 2025

2 tCO₂e

Free allocation, 2025

None

Allowance position, 2025

2 short

Compliance, 2024

A

Permit

14642-0041

Data as of

1 April 2026

Emissions and free allocation by year

Verified emissions Free allocation
Verified emissions and free allocation of REMONDIS Production- Alphagips ProduktionsanlageVerified emissions and free allocation from 2024 to 2025.011222024 verified emissions: 2 t2025 verified emissions: 2 t20242025
YearVerified emissions (t) Free allocationPosition
2025 2 none 2 short
2024 2 none 2 short

Verified emissions changed by 0% from 2024 to 2025.

Source: European Commission, Union Registry · Data as of 1 April 2026

Allowance position

In 2025, verified emissions exceeded free allocation by 2 allowances, which the operator had to obtain.

Illustrative value at the latest reference price of €84.41 (30 September 2026): €169. Not the installation's actual cost, which depends on when and how it acquired allowances.

Price source: EU ETS primary auctions · latest price

Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.

Nearby installations

Production or processing of gypsum or plasterboard installations in Germany, largest first.

Questions about REMONDIS Production- Alphagips Produktionsanlage

How much did REMONDIS Production- Alphagips Produktionsanlage emit in 2025?

2 tonnes of verified emissions, per EU Union Registry compliance data.

Did REMONDIS Production- Alphagips Produktionsanlage surrender enough allowances?

Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.