Werk in Siglingen
Werk in Siglingen is a production or processing of gypsum or plasterboard installation in Germany. It last reported verified emissions for 2024: 4,659 tonnes.
Key figures
Country
Installation ID
DE 226264
Verified emissions, 2024
4,659 tCO₂e
Free allocation, 2024
None
Allowance position, 2024
Not available
Compliance, 2024
A
Permit
14642-0044
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2024 | 4,659 | none | 4,659 short |
Source: European Commission, Union Registry ยท Data as of 1 April 2026
Allowance position
No verified emissions were reported for 2025, so there is no position for the latest year.
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Production or processing of gypsum or plasterboard installations in Germany, largest first.
- Iphofen Werk I 61,546 t in 2025
- Werk Berlin-Brieselang 36,529 t in 2025
- Gipsbauplattenwerk Schwarze Pumpe 29,146 t in 2025
- Knauf Deutsche Gipswerke KG Rottleberode 26,622 t in 2025
- Knauf Gips KG Neuss 21,219 t in 2025
Questions about Werk in Siglingen
How much did Werk in Siglingen emit in 2024?
4,659 tonnes of verified emissions, per EU Union Registry compliance data.
Did Werk in Siglingen surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.