Bellanaboy Bridge Gas Terminal
Bellanaboy Bridge Gas Terminal is a combustion of fuels installation in Ireland. In 2025 it reported 41,863 tonnes of verified emissions against 8,294 free allowances.
Key figures
Country
Activity
Installation ID
IE 206939
Verified emissions, 2025
41,863 tCO₂e
Free allocation, 2025
8,294 allowances
Allowance position, 2025
33,569 short
Compliance, 2024
A
Permit
IE-GHG161
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 41,863 | 8,294 | 33,569 short |
| 2024 | 41,973 | 8,294 | 33,679 short |
| 2023 | 38,806 | 8,294 | 30,512 short |
| 2022 | 41,656 | 8,294 | 33,362 short |
| 2021 | 40,539 | 8,294 | 32,245 short |
| 2020 | 40,692 | 32,270 | 8,422 short |
| 2019 | 41,626 | 32,910 | 8,716 short |
| 2018 | 42,538 | 33,549 | 8,989 short |
| 2017 | 48,365 | 34,188 | 14,177 short |
| 2016 | 45,133 | 34,923 | 10,210 short |
| 2015 | 11,519 | 0 | 11,519 short |
Verified emissions changed by +263.4% from 2015 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 33,569 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €2,883,577. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Ireland, largest first.
- Aughinish Alumina 1,107,056 t in 2025
- Dublin Bay Power Plant 886,437 t in 2025
- Whitegate Power Station 800,308 t in 2025
- Aghada CCGT 748,142 t in 2025
- ESB Poolbeg Generating Station 742,480 t in 2025
Questions about Bellanaboy Bridge Gas Terminal
How much did Bellanaboy Bridge Gas Terminal emit in 2025?
41,863 tonnes of verified emissions, per EU Union Registry compliance data.
How many free allowances did Bellanaboy Bridge Gas Terminal receive?
8,294 in 2025.
Did Bellanaboy Bridge Gas Terminal surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.