DUB 56 Data Processing Centre
DUB 56 Data Processing Centre is a combustion of fuels installation in Ireland. In 2025 it reported 368 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
IE 209903
Verified emissions, 2025
368 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
368 short
Compliance, 2024
A
Permit
IE-GHG184
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 368 | none | 368 short |
| 2024 | 404 | none | 404 short |
| 2023 | 276 | none | 276 short |
| 2022 | 256 | none | 256 short |
| 2021 | 202 | none | 202 short |
| 2020 | 616 | none | 616 short |
| 2019 | 194 | none | 194 short |
| 2018 | 3,171 | none | 3,171 short |
| 2017 | 263 | none | 263 short |
Verified emissions changed by +39.9% from 2017 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 368 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €31,611. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Ireland, largest first.
- Aughinish Alumina 1,107,056 t in 2025
- Dublin Bay Power Plant 886,437 t in 2025
- Whitegate Power Station 800,308 t in 2025
- Aghada CCGT 748,142 t in 2025
- ESB Poolbeg Generating Station 742,480 t in 2025
Questions about DUB 56 Data Processing Centre
How much did DUB 56 Data Processing Centre emit in 2025?
368 tonnes of verified emissions, per EU Union Registry compliance data.
Did DUB 56 Data Processing Centre surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.