Edenderry Power Plant
Edenderry Power Plant is a combustion of fuels installation in Ireland. In 2025 it reported 958 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
IE 6
Verified emissions, 2025
958 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
958 short
Compliance, 2024
A
Permit
IE-GHG007
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 958 | none | 958 short |
| 2024 | 1,107 | none | 1,107 short |
| 2023 | 194,009 | none | 194,009 short |
| 2022 | 277,906 | none | 277,906 short |
| 2021 | 334,945 | none | 334,945 short |
| 2020 | 292,674 | none | 292,674 short |
| 2019 | 417,054 | none | 417,054 short |
| 2018 | 565,097 | none | 565,097 short |
| 2017 | 548,330 | none | 548,330 short |
| 2016 | 538,866 | none | 538,866 short |
| 2015 | 680,652 | none | 680,652 short |
| 2014 | 697,174 | none | 697,174 short |
| 2013 | 615,975 | none | 615,975 short |
Verified emissions changed by -99.8% from 2013 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 958 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €85.90 (28 September 2026): €82,292. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Ireland, largest first.
- Aughinish Alumina 1,107,056 t in 2025
- Dublin Bay Power Plant 886,437 t in 2025
- Whitegate Power Station 800,308 t in 2025
- Aghada CCGT 748,142 t in 2025
- ESB Poolbeg Generating Station 742,480 t in 2025
Questions about Edenderry Power Plant
How much did Edenderry Power Plant emit in 2025?
958 tonnes of verified emissions, per EU Union Registry compliance data.
Did Edenderry Power Plant surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.