Equinix Hyperscale 1 (DB5) Limited
Equinix Hyperscale 1 (DB5) Limited is a combustion of fuels installation in Ireland. In 2025 it reported 364 tonnes of verified emissions against 0 free allowances.
Key figures
Country
Activity
Installation ID
IE 218161
Verified emissions, 2025
364 tCO₂e
Free allocation, 2025
None
Allowance position, 2025
364 short
Compliance, 2024
A
Permit
IE-GHG600-01
Data as of
1 April 2026
Emissions and free allocation by year
| Year | Verified emissions (t) | Free allocation | Position |
|---|---|---|---|
| 2025 | 364 | none | 364 short |
| 2024 | 29,232 | none | 29,232 short |
| 2023 | 786 | none | 786 short |
| 2022 | 2,409 | none | 2,409 short |
Verified emissions changed by -84.9% from 2022 to 2025.
Source: European Commission, Union Registry · Data as of 1 April 2026
Allowance position
In 2025, verified emissions exceeded free allocation by 364 allowances, which the operator had to obtain.
Illustrative value at the latest reference price of €84.87 (29 September 2026): €30,893. Not the installation's actual cost, which depends on when and how it acquired allowances.
Price source: EU ETS primary auctions · latest price
Compliance status for 2024: A. The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.
Nearby installations
Combustion of fuels installations in Ireland, largest first.
- Aughinish Alumina 1,107,056 t in 2025
- Dublin Bay Power Plant 886,437 t in 2025
- Whitegate Power Station 800,308 t in 2025
- Aghada CCGT 748,142 t in 2025
- ESB Poolbeg Generating Station 742,480 t in 2025
Questions about Equinix Hyperscale 1 (DB5) Limited
How much did Equinix Hyperscale 1 (DB5) Limited emit in 2025?
364 tonnes of verified emissions, per EU Union Registry compliance data.
Did Equinix Hyperscale 1 (DB5) Limited surrender enough allowances?
Its compliance status for 2024 is recorded as "A": The number of allowances surrendered by 30 September 2025 was greater than or equal to verified emissions.