EU ETS installations in Netherlands
In 2025, 303 installations reported 61,614,401 tonnes of verified emissions and received 31,834,295 free allowances. 511 installations are on record since 2013.
Reporting in 2025
303
Verified emissions
61,614,401 t
Free allocation
31,834,295
Allocation as share of emissions
51.7%
Source: European Commission, Union Registry · Data as of 1 April 2026
By activity, 2025
- Combustion of fuels 33,001,624 t · 209
- Refining of mineral oil 10,364,839 t · 5
- Production of bulk chemicals 5,834,588 t · 15
- Production of pig iron or steel 5,689,202 t · 1
- Production of ammonia 3,118,291 t · 1
- Production of hydrogen and synthesis gas 1,737,083 t · 6
- Production of paper or cardboard 555,866 t · 14
- Manufacture of ceramics 446,800 t · 37
- Manufacture of glass 275,385 t · 5
- Production of carbon black 176,024 t · 1
- Production of lime, or calcination of dolomite/magnesite 145,325 t · 1
- Manufacture of mineral wool 134,812 t · 2
- Production of secondary aluminium 68,426 t · 2
- Production or processing of gypsum or plasterboard 32,933 t · 2
- Production or processing of non-ferrous metals 22,650 t · 1
- Metal ore roasting or sintering 10,553 t · 1
Installations
Largest 2025 verified emissions first; installations that did not report in 2025 follow.
- Nobian Chemicals B.V. (Rotterdam) 102,614 t in 2025
- Air Products Nederland B.V., Locatie Botlek (Merseyweg) 98,761 t in 2025
- AVEBE U.A. locatie Ter Apelkanaal 92,320 t in 2025
- FrieslandCampina DMV B.V., locatie Veghel 88,719 t in 2025
- Shin-Etsu PVC B.V., locatie Botlek 86,576 t in 2025
- ESD-SIC bv 85,535 t in 2025
- Smurfit Westrock Parenco B.V. 79,797 t in 2025
- Total offshore platform K5 Central Complex 74,602 t in 2025
- LANXESS Chemical B.V. 74,327 t in 2025
- Bunge Netherlands B.V. Amsterdam 66,952 t in 2025
- Lamb Weston - Vestiging Kruiningen 64,339 t in 2025
- Eni Energy Netherlands B.V., L10-A platform 62,683 t in 2025
- Air Liquide Industrie B.V. vest. Bergen op Zoom 62,208 t in 2025
- Synthomer Middelburg B.V. 62,121 t in 2025
- A12/CPP Petrogas E&P Netherlands B.V. 61,243 t in 2025
- Tenaz Energy Netherlands B.V. locatie L9-FF-1 58,527 t in 2025
- Ardagh Glass Moerdijk B.V. 57,746 t in 2025
- TAQA Offshore B.V. 56,183 t in 2025
- Eni Energy Netherlands B.V., F3-FB-1 platform 55,687 t in 2025
- O-I Manufacturing Netherlands B.V., vestiging Maastricht 55,020 t in 2025
- Ardagh Glass Dongen B.V. 54,914 t in 2025
- AVEBE U.A. locatie Gasselternijveen 54,399 t in 2025
- EemsEnergy Terminal B.V. 54,312 t in 2025
- Platform J6-A 54,221 t in 2025
- Aviko B.V., vestiging Steenderen 53,297 t in 2025