EU ETS installations in Norway
In 2025, 147 installations reported 20,558,860 tonnes of verified emissions and received 11,693,158 free allowances. 179 installations are on record since 2013.
Reporting in 2025
147
Verified emissions
20,558,860 t
Free allocation
11,693,158
Allocation as share of emissions
56.9%
Source: European Commission, Union Registry · Data as of 1 April 2026
By activity, 2025
- Combustion of fuels 10,800,102 t · 93
- Production of primary aluminium 2,307,389 t · 7
- Production or processing of ferrous metals 2,158,005 t · 10
- Production of bulk chemicals 1,735,067 t · 8
- Refining of mineral oil 1,485,426 t · 1
- Production of cement clinker 839,974 t · 2
- Production or processing of non-ferrous metals 632,712 t · 3
- Production of lime, or calcination of dolomite/magnesite 319,196 t · 3
- Production of pulp 102,341 t · 6
- Production of pig iron or steel 82,066 t · 1
- Manufacture of glass 32,882 t · 3
- Production or processing of gypsum or plasterboard 20,415 t · 2
- Manufacture of mineral wool 17,151 t · 2
- Production of secondary aluminium 15,489 t · 1
- Production of paper or cardboard 10,645 t · 4
- Manufacture of ceramics 0 t · 1
Installations
Largest 2025 verified emissions first; installations that did not report in 2025 follow.
- Södra Cell Tofte AS no emissions reported since 2014
- Vår Energi AS Jotun no emissions reported since 2020
- Wienerberger AS Bratsberg Teglverk no emissions reported since 2014
- Øraveien Industripark AS no emissions reported since 2014