La Ferme - Bambous solar photovoltaic power plant

Registry Record

Registry

Verra

Project ID

VCS1483

Country

Mauritius

Category

Renewable Energy

Methodology

acm0002

Status

Registered

Credits Issued

213,006 tCO₂e

Credits Retired

139,265 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2014 to 2024: 213,006 tonnes issued and 139,265 retired.012.5k25k37.5k50k2014 issued: 20,017 tonnes2014 retired: 20,017 tonnes20142015 issued: 21,100 tonnes2015 retired: 20,800 tonnes20152016 issued: 21,799 tonnes2016 retired: 21,799 tonnes20162017 issued: 21,827 tonnes2017 retired: 21,827 tonnes20172018 issued: 21,348 tonnes2018 retired: 21,348 tonnes20182019 issued: 21,423 tonnes2019 retired: 11,823 tonnes20192020 issued: 21,354 tonnes2020 retired: 12,052 tonnes20202021 issued: 21,642 tonnes2021 retired: 9,599 tonnes20212022 issued: 21,304 tonnes20222023 issued: 19,029 tonnes20232024 issued: 2,163 tonnes2024
VintageIssued (tCO₂e)Retired (tCO₂e)
20242,163none
202319,029none
202221,304none
202121,6429,599
202021,35412,052
201921,42311,823
201821,34821,348
201721,82721,827
201621,79921,799
201521,10020,800
201420,01720,017

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2014, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2014, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Mauritius and Article 6

Bilateral agreements
0
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
4
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

23.9% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Stadtwerke Rostock20,0002021
Delta Air Lines12,2002020
eprimo1,1342022

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

La Ferme - Bambous solar photovoltaic power plant is registered with Verra under the acm0002 protocol, located in Mauritius. As of 1 June 2026, registry records show 213,006 tonnes issued and 139,265 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has La Ferme - Bambous solar photovoltaic power plant issued?

213,006 tonnes of credits have been issued and 139,265 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from La Ferme - Bambous solar photovoltaic power plant?

Registry records name 3 organisations, including Stadtwerke Rostock, Delta Air Lines, eprimo. Many retirements name no beneficiary.

Registry data as of June 1, 2026